What tasks does the development of instructions and video materials for the assembly process solve?

A series of problems.

  • There are no instructions on the order in which to install the parts.
  • Some parts are not prepared and require modification.
  • The lamella size in the drawings is incorrect. Specifically, the top part where the semicircular piece meets the 90-degree cut.

Total financial losses (approximately)

Name Cost €
Two workers 80 / h
Time 1.5 hours
preparation of parts (time) 1 hour
result 2.5*80=200 €

Problems solved by the development of instructions and training materials